Office of the University Registrar

COVID-19 Information

 
Fall 2020 Semester Course Delivery Identification in CampusNet (COVID-19)

For a guide to the different icons and messages used in CampusNet to designate remote and on-campus classes, click here.

 

** New classroom locations **

To adhere to established social distancing guidelines, we have adjusted the room capacities for our classrooms, labs and conference rooms.  To accommodate some of our larger classes, we have introduced some new classroom spaces this semester in various buildings on campus, such as in the Wolstein Center (WO), the Recreation Center (RC), Fenn Tower (FT) and the Student Center (SC).  These locations will have signage posted to assist you in navigating, but classes in the Wolstein Center and Recreation Center require some additional information.  Please review the information below for more information.

Recreation Center

Room RC 152: Enter through the main entrance of the Recreation Center at the corner of Chester Avenue and East 24th Street. Recreation Services will provide a greeter as you enter the facility and assist you to the MAC Gym. The MAC Gym is located on the first floor at the end of the main hallway.  

Wolstein Center
  • Rooms WO 410, WO 411 and WO 501: Enter through the Annex entrance under the green awning on the Prospect/E. 21 side of the building.
  • Arena floor (Choral classes): Enter at the Medical Mutual Gate on the Prospect/E. 21 side of the building.

There will be signage and staff on hand to point faculty and staff in the right direction. See the entrance map here.

Berkman Hall Construction

Excuse our dust! Construction is in progress on the 4th floor of Berkman Hall as we renovate classrooms and upgrade with new technology. Please be aware of, and follow all instructions on, construction signage.

 

For updates and FAQs on academics and campus operations, check out the Safe Campus CSU website.