Rhodes Tower (RT)
1860 East 22nd Street
Project Number: CP-0809

Current Status:

Complete and closed

Prime Contractor: EnviroCom Construction

Time Frame

Construction Start Date: July 1, 2009
Completion Date: November 10, 2010

Description of Work

Rhodes Tower located on the campus of Cleveland State University in downtown Cleveland, Ohio, is a 21 story, 500,000 square foot building that was constructed in the early 1970’s. In recent years the 19th floor has been plagued by leaks beneath the 20th floor’s mechanical room exterior walls and an existing EPDM mezzanine roof. This project will involve the replacement of the mezzanine roof system and the replacement of the exterior wall’s panels, steel siding and louvers. The project is also to include 100% sealant replacement on all four sides of the Tower. An investigative study was conducted for the roofing portion of the project and will be available. The building will be occupied during construction.

 

Budget

Project Budget: $3,000,000
Construction Budget: $ 000,000

Project Team

Design Architects
Makovich & Pusti Architects, Inc.

CSU Staff
Project Manager: Melanie Boyd

University Architect: Ed Schmittgen

Financing: 

Local Funds

Last Updated: April 2011

engaged learning
Mailing Address
Cleveland State University
2121 Euclid Avenue, PS 235H
Cleveland, OH 44115-2214
Campus Location
Plant Services, Room 235
1802 East 25th Street
Phone: 216.687.5121
Fax: 216.687.9227
architect@csuohio.edu


This site contains files that require the free Adobe Reader to view.