Current Status:

Planning Study

Description of Work

This study reviews the exterior masonry of the Physical Education Building built circa 1972. The study was notes that the exterior masonry has moved by observation of deterioration of the joints and the sealant. In addition, numerous vertical cracks and deflection of the brick exterior were observed. Observation openings were made in the Brick fascia and the insulation and air space were compromised with water due to the movement and failure of the sealant and flashing. The structural engineer engaged to observe the damage noted that the east and south walls should be repaired within a year of the report dated 11/17/10.

 

Budget

Project Team

Planning Consultants
Construction Resources, Inc.

CSU Staff
Project Manager: Hugh Holley

University Architect: Ed Schmittgen

Project Budget: $000,000
Construction Budget: $2,684,000     Based on 2010 rates.

 

Financing: 

Awaiting Local Funds

Last Updated: April 2011

engaged learning
Mailing Address
Cleveland State University
2121 Euclid Avenue, PS 235H
Cleveland, OH 44115-2214
Campus Location
Plant Services, Room 235
1802 East 25th Street
Phone: 216.687.5121
Fax: 216.687.9227
architect@csuohio.edu


This site contains files that require the free Adobe Reader to view.