Main Classroom Lower Level on East 22nd Street
Main Classroom (MC)
1899 East 22nd Street)
Planning Study
Time Frame
Main Classroom E 22nd Street level repairs and pre cast panels repair. This review was conducted as part of the Student Center project after the south pedestrian bridge over E 22nd Street was removed and a gap was left in the pre cast panels, as well as the fact that columns, beams and under deck of the Main Classroom are deteriorating. The repairs are needed to replace pre cast panels, repair and patch deteriorated concrete as well as existing expansion joints.
CSU Staff
Project Manager: Hugh Holley
University Architect: Ed Schmittgen
Budget
Project Budget: $1,712,520 Estimate based on 2010 rates
Construction Budget: $ 000,000
Awaiting Local Funding