Main Classroom Lower-Level Garage
Pre-Planning Study
Main Classroom Lower Level Garage. No study has been done that this Office is aware of however there is substantial deterioration of the Lower Level Garage that was noted during the repair of the Upper Level Garage completed during the Main Classroom Project.
Project Budget: $581,000 Estimate based on 2010 rates.
Construction Budget: $ 000,000
Awaiting Local Funding
CSU Staff
Project Manager: Hugh Holley